Skikda Refinery Rehabilitation And Adaptation Project

Client: Samsung Engineering
Contract Amoun: Usd 11,720,000
Type Of Contract: Epc Packages
Contract Period: 2010, Jun. ~ 2012, May.

Major Work Performed

1. Air Handilg Unit: 43 Sets
Packaged Air Conditioner: 17 Sets
Chemical Filter Unit: 14 Sets
Electric Duct Heaters: 27 Sets
Electric Water Heater: 13 Sets
Control Panel: 29 Sets
Air Cooled Condensing Unit: 43 Sets
Pressurization Unit: 15 Sets
Ventilation Fans: 114 Sets
Electric Steam Humidifier: 32 Sets
Air Curtain: 55 Sets
Mcc Pane: 30 Sets

2. Installation Of Hvac Duct Work, Plumbing Fixture Work, Potable Water Piping Work,
Drainage And Soil Piping Work, Vent Piping Work, Equipment Drainage Piping Work,
Refrigerant Piping Work, Hvac Control And Power Work.

Major Work Volume

Hvac Duct: 23,170 Sqm
Hvac Piping: 2,676 Lm
Sanitary, Plumbing Piping: 5,310 Lm